District Systems
Infrastructure
Wells, pipelines, and system components serving the High Plains Water Users Association district.
System Components
Current status of all major district infrastructure assets.
Well 1 — Holly Street
Well
Secondary production well. Equipped with submersible pump and automated controls.
Depth: 241+ ft · Capacity: 27 GPM · Installed: 2026
Well 2 — Quebec Street
Well
Primary production well serving the service area.
Depth: 238+ ft · Capacity: 53 GPM · Installed: 2014
Main Distribution Pipeline
Pipeline
Primary distribution main, running through the core service area. Installed and maintained to district standards.
Length: 24.9 miles · Material: PVC/HDPE · Installed: VARIES
Storage Tanks
Water Storage
SEMI-Above-ground storage tanks providing pressure equalization and emergency reserve capacity for the customers.
Capacity: 100,000 gal · Installed: VARIES
Flushes
Distribution
End-system drain stations; maintains adequate water quality throughout the entire service area.
Output: 40 GPM · Completed: November 2026
ICBM Water
Operations
Licensed system operator responsible for day-to-day operation, maintenance, and regulatory compliance of the HPWUA water system.
Operator: Felicia Weisser · License: Colorado Class B · Contact: highplainswater@outlook.com
Capital Projects
Current and upcoming infrastructure improvement projects.
Well 2 (Quebec) Relocation
In ProgressPhase 1
Relocation of Well 2 Phase 1 is on going. Phase 1 planning is ongoing, once Parterre successfully purchases a plot of property to the east of our current location. Plans are being re-drafted to re-locate our well to the east onto new *DEEDED* property. A meeting was conducted with the Board and our legal team in October 2026, With the City of Thornton, and the developer where City of Thornton tried to strong arm a deal to remove deeded property for a permanent easement on COT property. This was strongly rejected and a new idea for an eastern movement was presented by the Board to avoid COT Politics.
Last updated: November 2026
Pipeline Inspection & Condition Assessment
PlannedScheduled 2027
Comprehensive inspection of the main distribution pipeline to assess condition and identify any sections requiring repair or replacement.
Last updated: October 2026
Storage Tank Protection
In ProgressScheduled 2027
The private property around our Storage tanks and Well #2 has been sold and will be developed. The plans for this project have been discussed with our legal advisor and our Board. Plans have been drafted for permanent protection of our potable water supply.
Last updated: November 2026
Service Line Mapping & GIS Update
In ProgressOn-Going
Comprehensive mapping of all district service lines and infrastructure assets into a GIS database to improve maintenance planning, emergency response, and long-term capital planning.
Last updated: November 2026
Well 1 Re-hab
CompleteCompleted
Rehabilitation of Well 2 including installation of a new well pump and replacement of the water pick-up pipe from the pump to the well house. Project completed on schedule, restoring full production capacity.
Last updated: September 2026
Tank Re-Surfacing and Crack Seal
CompleteCompleted
Re-surfacing and crack sealing of district storage tanks to maintain structural integrity and extend service life. Project completed on schedule.
Last updated: October 2026