District Systems

Infrastructure

Wells, pipelines, and system components serving the High Plains Water Users Association district.

System Components

Current status of all major district infrastructure assets.

Well 1 — Holly Street

Well

Operational

Secondary production well. Equipped with submersible pump and automated controls.

Depth: 241+ ft · Capacity: 27 GPM · Installed: 2026

Well 2 — Quebec Street

Well

Operational

Primary production well serving the service area.

Depth: 238+ ft · Capacity: 53 GPM · Installed: 2014

Main Distribution Pipeline

Pipeline

Operational

Primary distribution main, running through the core service area. Installed and maintained to district standards.

Length: 24.9 miles · Material: PVC/HDPE · Installed: VARIES

Storage Tanks

Water Storage

Operational

SEMI-Above-ground storage tanks providing pressure equalization and emergency reserve capacity for the customers.

Capacity: 100,000 gal · Installed: VARIES

Flushes

Distribution

Operational

End-system drain stations; maintains adequate water quality throughout the entire service area.

Output: 40 GPM · Completed: November 2026

ICBM Water

Operations

Active

Licensed system operator responsible for day-to-day operation, maintenance, and regulatory compliance of the HPWUA water system.

Operator: Felicia Weisser · License: Colorado Class B · Contact: highplainswater@outlook.com

Capital Projects

Current and upcoming infrastructure improvement projects.

Well 2 (Quebec) Relocation

In Progress

Phase 1

Relocation of Well 2 Phase 1 is on going. Phase 1 planning is ongoing, once Parterre successfully purchases a plot of property to the east of our current location. Plans are being re-drafted to re-locate our well to the east onto new *DEEDED* property. A meeting was conducted with the Board and our legal team in October 2026, With the City of Thornton, and the developer where City of Thornton tried to strong arm a deal to remove deeded property for a permanent easement on COT property. This was strongly rejected and a new idea for an eastern movement was presented by the Board to avoid COT Politics.

Last updated: November 2026

Pipeline Inspection & Condition Assessment

Planned

Scheduled 2027

Comprehensive inspection of the main distribution pipeline to assess condition and identify any sections requiring repair or replacement.

Last updated: October 2026

Storage Tank Protection

In Progress

Scheduled 2027

The private property around our Storage tanks and Well #2 has been sold and will be developed. The plans for this project have been discussed with our legal advisor and our Board. Plans have been drafted for permanent protection of our potable water supply.

Last updated: November 2026

Service Line Mapping & GIS Update

In Progress

On-Going

Comprehensive mapping of all district service lines and infrastructure assets into a GIS database to improve maintenance planning, emergency response, and long-term capital planning.

Last updated: November 2026

Well 1 Re-hab

Complete

Completed

Rehabilitation of Well 2 including installation of a new well pump and replacement of the water pick-up pipe from the pump to the well house. Project completed on schedule, restoring full production capacity.

Last updated: September 2026

Tank Re-Surfacing and Crack Seal

Complete

Completed

Re-surfacing and crack sealing of district storage tanks to maintain structural integrity and extend service life. Project completed on schedule.

Last updated: October 2026